CIOB Commission of Past Presidents
On 21 June 2017, the Chartered Institute of Building (CIOB) announced the formation of a Commission of Past Presidents to investigate construction industry build quality; a particularly pertinent subject in light of the Grenfell Tower fire disaster.
In addition to Grenfell, the commission comes following the Cole Report, which investigated the defects that led to the closure of 17 Edinburgh schools earlier in 2017 and the wall failure at Oxgangs Primary School in January 2016 [see top image].
The Commission will investigate what steps CIOB should take to address; management and supervision, the importance of an education framework, steps the industry can take to improve build quality.
Chair of the Commission, Immediate Past President Paul Nash, said:
“The recent tragic events at Grenfell Tower have further underlined the need for an urgent review of the way in which quality is managed in our industry. Whilst aspects of the public inquiry must necessarily focus on the issues of regulation and inspection, I think we have to look beyond this at the behaviours that have led to a lack of focus on quality at all stages of the build process, from design and procurement through to construction and re-fit.
“The CIOB has a duty to respond to this issue, acting in the public interest. As professionals we have a duty to the industry and wider society to act responsibly and ethically. This defines what it means to be a professional. And we all have a responsibility for the reputation of our industry and, most importantly, the wellbeing of those who use the buildings that we create.”
--CIOB
NB On 21 June 2017, evidence to the Scottish Education Committee revealed that defects had been discovered at five more Edinburgh schools following inspections carried out in the wake of the Oxgangs Primary School wall collapse.
[edit] Related articles on Designing Buildings
- Articles by CIOB on Designing Buildings Wiki.
- CIOB president sees change ahead.
- CIOB strengthens governance structure with new Chair role.
- Design quality.
- Inquiry into the construction of Edinburgh schools view of the RIAS.
- Quality control.
- Quality in construction projects.
- Risk management.
- Total quality management in construction.
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..